
|
1. Check desired wall location for wiring and
plumbing that could interfere Locate and
check spacing of studs Mark studs. |

|
2. Measure desired height location. |

|
3. Draw out level lines to cut wall
14” wide x 12” high. |

|
4. Cut dry wall in between wall studs. |

|
5. Clean out opening of drywall dust. |
|
6. Install shelf at desired height,
check to be sure it does not interfere
with lock opening. |

|
7. Slide Quick Vault into cut out. |

|
8. Pull back interior felt lining inside
Quick Vault to locate installation holes,
there are 2 on each side, on the hinge
side the holes are toward the front,
and are not threaded. |

|
9. Pre-drill holes into studs for screws.
Fasten lag screws through Vault into
stud, minimum recommended screw size
1/4” x 1” Screw size may vary depending
on location. |

|
10. Set your personal combination.
Enjoy your V-Line Quick Vault.
For complete concealment
hang a picture over the Quick Vault. |